Cisco N540X-6Z18G-SYS-A 설치 준비 - 페이지 10

{카테고리_이름} Cisco N540X-6Z18G-SYS-A에 대한 설치 준비을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco N540X-6Z18G-SYS-A 14 페이지.
Cisco N540X-6Z18G-SYS-A에 대해서도 마찬가지입니다: 매뉴얼 (30 페이지)

Cisco N540X-6Z18G-SYS-A 설치 준비

Prepare Rack for Router Installation

Figure 6: Wearing the ESD Strap
Prepare Rack for Router Installation
Install the chassis into a two-post standard rack with standard horizontal mounting rails. Before you mount
the chassis into the rack, we recommend that you do the following:
Step 1
Place the rack where you plan to install the chassis. Ensure that the rack is grounded to earth.
Step 2
Secure the rack to the floor.
To bolt the rack to the floor, a floor bolt kit (also called an anchor embedment kit) is required. For information on bolting
the rack to the floor, consult a company that specializes in floor mounting kits (such as Hilti; see
Make sure that floor mounting bolts are accessible, especially if an annual retorquing of bolts is required.

Cabinet Selection Guidelines

Equipment that is intended for installation in controlled environmental space has average yearly levels of
contamination. Ventilated cabinets or racks can be used if pollutant levels are maintained within allowable
limits.
Equipment intended for installation in outside plant (OSP) areas must have sealed cabinets with heat exchanger
that meet the NEMA -4 or IP66 protection and low average yearly levels of concentration of contaminants
inside the cabinet.
Prepare for Installation
10
Prepare for Installation
Hilti.com
for details).