Cisco NCS 6000 매뉴얼 - 페이지 20
{카테고리_이름} Cisco NCS 6000에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco NCS 6000 27 페이지.

Installing AC Input Power Cords
The circuit breaker and fuse lockout procedures should follow the rules and regulations in the National
Caution
Electrical Code (NEC) and any local codes.
The AC power system requires single-phase AC input power to each PM. If you have 3-phase AC Delta
Note
or AC Wye at your equipment, a Cisco NCS 6000 Series power distribution unit (PDU) is required to
convert 3-phase AC input power to single-phase AC input power (Cisco PID NCS-PDU-DELTA or Cisco
PID NCS-PDU-WYE). For more information, see the
Installation
Required Tools and Equipment
• 6-inch, Number 1 Phillips-head screwdriver
• AC input power cords, depending on the locale (Appendix B, "System Product IDs.")
Steps
To install the AC input power cords, follow these steps:
Step 1
On the rear of the FCC, insert the cord plug into the cord clamp following the labeling on the phase assignments from
the PDU or the labeling on the single-phase power cords.
Step 2
Use the screwdriver to secure the screw that clamps the cord plug in place.
Figure 16: AC Input Power Cords Connected to the Power Tray
Cisco Network Convergence System 6000 Fabric Card Chassis Hardware Installation Guide
20
Guide.
Installing the Power Components
Cisco CRS 3-Phase AC Power Distribution Unit