Cisco XR 12416 재포장 매뉴얼 - 페이지 20
{카테고리_이름} Cisco XR 12416에 대한 재포장 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco XR 12416 26 페이지. Cisco systems router owner's manual
Cisco XR 12416에 대해서도 마찬가지입니다: 설치 매뉴얼 (41 페이지)
Repackaging the Routers
Reinstalling the Front Covers
Repackaging the Router Accessories
Repackaging the Rack-Mounting Platform
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Cisco XR 12416 and Cisco XR 12816 Router Chassis Installation Guide
A-20
If you removed DC-input power entry modules, reinstall each power entry module
as instructed in the
"Installing DC-Input Power Entry Modules" section on
page
3-78.
When the router is repackaged for shipping, two foam inserts must be paced
around the top of the router. To avoid interference with the foam inserts, the front
cover for the power shelf and upper blower module should not be reinstalled on
the router. It must be placed in its original box and packaged in the accessories
boxed.
Reinstall the other front covers as instructed in the
section on page
3-39.
To protect the accessories and the router from damage during shipment, you must
repackage the router accessories in their original packaging and reassemble the
accessories boxes into a package that is packed against the back panel of the
router on the deck of the pallet body.
To repackage the rack-mounting platform, follow these steps:
Remove the screws that fasten the angle brackets to the sides of the rack-mounting
platform.
Place the screws and brackets in a plastic bag.
Screw the threaded leveling feet completely into the legs of the platform.
Turn the platform on its top and place it in its accessories box.
Place the bag of screws and brackets in the accessories box.
Place the corrugated pad foam side down on top of the platform.
Close and seal the platform accessories box.
Appendix A
Repackaging the Router
"Installing the Front Covers"
OL-17440-01