Cisco SCE8000 10 GBE 빠른 시작 매뉴얼 - 페이지 21

{카테고리_이름} Cisco SCE8000 10 GBE에 대한 빠른 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco SCE8000 10 GBE 25 페이지. 10 gbe power supply

ip default-gateway 10.56.96.1
line vty 0 4
exit
management-agent property "com.pcube.management.framework.install.activation.operation" "Install"
management-agent property "com.pcube.management.framework.install.activated.package" "SCA BB"
management-agent property "com.pcube.management.framework.install.activated.version" "3.1.6 build 79"
management-agent property "com.pcube.management.framework.install.activation.date" "Sun May 11 08:44:04
GMT+00:00 2008"
flow-filter partition name "ignore_filter" first-rule 4 num-rules 32
flow-filter partition name "udpPortsToOpenBySw" first-rule 40 num-rules 21
SCE#copy running-config startup-config
Writing general configuration file to temporary location...
Backing-up general configuration file...
Copy temporary file to final location...
SCE#

Loading and Activating a Service Control Application

The Cisco SCE8000 platform provides the basic functionality of service control analysis and enforcement. A service control
solution requires that a service control application be loaded into the platform to take advantage of the unique SCE platform
capabilities.
Loading and activating an application includes the following stages:
• Downloading the application provided as an SLI file to the Cisco SCE 8000 disk.
• Activating the application.
• Configuring the application.
The procedures for performing these operations is not described in this guide. For details, refer to the following documentation:
Cisco Service Control Application for Broadband User Guide
Cisco Service Control Application for Broadband Reference Guide
7

Troubleshooting

Troubleshooting the Cisco SCE 8000 Operational Status

Table 8 lists the operational states of the Cisco SCE 8000. The Status LED on the service control module reflects current
Cisco SCE 8000 operational status. To show operational status, enter the command show system operation-status. Table 9 and
Table 10 list LED status explanations.
Table 8
Cisco SCE 8000 Operational States
Cisco SCE8000
Operational Status
Booting
Operational
Description
Initial state after reset
Cisco SCE 8000 becomes operational after completing the following:
• Boot is completed
• Power self-tests are completed without failure
• Platform configuration is applied
Status LED State
Amber
Steady green
21