Cisco ONS 15454 포장 풀기 및 설치 - 페이지 14
{카테고리_이름} Cisco ONS 15454에 대한 포장 풀기 및 설치을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco ONS 15454 40 페이지. Four-shelf and zero-shelf bay assembly
Cisco ONS 15454에 대해서도 마찬가지입니다: 설치 지침 매뉴얼 (22 페이지), 설치 (32 페이지), 설치 (32 페이지), 포장 풀기 및 설치 (42 페이지)
Installation Instructions
You can use the base plate or extender base holes to route the fibers. Cisco recommends using the base
plate holes for the bottom node and the extender base holes for the other three nodes on the four-node
rack. All electrical cables will be routed in the back of the rack in the extender bases. Holes should
already be cut out in the raised floor tile to compensate for any DS1, DS3, ground and power cables.
Once all fiber cables have been placed in the front portion of the rack, replace the base plate by sliding
Step 3
it toward the back of the rack.
Figure 10
shows the routed fiber with the base plate replaced.
Figure 10
Raised Floor Base Fiber Routing
Unpacking and Installing the Cisco ONS 15454 Four-Shelf and Zero-Shelf Bay Assembly
14
78-15720-04