Ariston PRIMO HE ITD 125 설치 및 사용 설명서 지침 - 페이지 20

{카테고리_이름} Ariston PRIMO HE ITD 125에 대한 설치 및 사용 설명서 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Ariston PRIMO HE ITD 125 24 페이지. Unvented hot water storage cylinders
Ariston PRIMO HE ITD 125에 대해서도 마찬가지입니다: 설치, 서비스 및 운영 지침 (34 페이지)

www.tradeplumbing.co.uk Call Sales On 08708034288
www.tradeplumbing.co.uk Call Sales On 08708034288
20
Unvented Controls(s)
Check controls as per the following:
1) Line strainer - with the water supply turned off remove screen from
strainer and clean of any detritus;
2) Expansion vessel - with the water supply turned off and taps open, check
expansion vessel pressure and top up as necessary;
3) Temperature & pressure relief valve - with the water supply turned on,
check manually by lifting the test lever/turning the test knob (ensure valve
closes after testing);
4) Expansion relief valve - check manually by turning the test knob (ensure
valve closes after testing);
5) Discharge pipes (D1) - from both temperature & pressure relief and
expansion relief valve for obstructions;
6) Tundish & discharge pipe (D2) - open either valve gradually to produce a
full bore discharge into tundish and D2 without any back pressure;
7) Pressure reducing valve - check that the correct outlet pressure is being
maintained by recording the pressure at an in-line terminal fitting i.e. tap.
Thermostats
Ensure that all thermostats adjusted for the correct temperature setting, this
should be between 60 and 65°C.
N
!
OTE
W
HERE THERE IS A POSSIBILITY OF SCALE FORMING
THE THERMOSTAT TO BELOW
,
IT IS RECOMMENDED TO ADJUST
60
O
C