Ariston GENUS PREMIUM EVO HP 150 설계, 설치 및 서비스 지침 - 페이지 24

{카테고리_이름} Ariston GENUS PREMIUM EVO HP 150에 대한 설계, 설치 및 서비스 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Ariston GENUS PREMIUM EVO HP 150 44 페이지. Wall-hung condensing gas boiler hp
Ariston GENUS PREMIUM EVO HP 150에 대해서도 마찬가지입니다: 사용자 설명서 (17 페이지), 사용자 설명서 (24 페이지)

Ariston GENUS PREMIUM EVO HP 150 설계, 설치 및 서비스 지침
commissioning

First ignition

1. Make sure that:
-
The gas valve is closed;
-
The electrical connection has been properly carried out.
Make sure that, in any case, the green/yellow earthing wire
is connected to an effi cient earthing system;
-
Use a screwdriver to lift the cap on the automatic air relief
valve;
2. Switch on the boiler (by pressing the ON/OFF button) and use
the M
button to select the standby mode, where no hot
ODE
water or heating requests are made.
01/01/2000
40°C
3. Start the deaeration cycle by pressing ESC for 5 seconds
The boiler will start a deaeration cycle lasting about 7 minutes.
If you need to stop it press ESC.
At the end, check that the system is completely deaerated and,
if not, repeat the procedure.
Airpurge attiva
4. Bleed the air from the radiators.
5. Check the pressure gauge reading to verify that there is
suffi cient plant pressure (1-1.5 mbar); if not, the display will
signal the need for re-establishing the pressure.
Re-establish the pressure by opening the water inlet valve
located underneath the boiler.
6. The exhaust duct for combustion products should be suitable
and free from any obstructions;
7. Any necessary ventilation inlets in the room should be open
(type B installation).
8. Check whether the siphon contains water; if not, it must be
refi lled.
N.B.: if the boiler will not be used for long periods, the
siphon should be fi lled before the boiler is started up
again. It is dangerous not to refi ll the siphon as fumes may
be released into the environment.
9. Open the gas valve and check the connection seals, including
the boiler connection seals, making sure that the meter does
not detect any passage of gas. Eliminate any leaks.
10. Start the boiler by selecting the heating or domestic hot water
operation using the M
ODE
24
00:00
70°C
button.
Deaeration cycle
During the fi lling stage or if there is excess air in the system,
the deaeration cycle can be activated by holding the E
button for 5 seconds. The boiler will start a cycle which lasts
approximately 7 minutes. When this is complete the menu
screen will be restored. The cycle may either be repeated, if
necessary, or stopped by pressing E
until the normal display screen is restored.
SC
. Press the E
button
SC
SC