Aeotec Z-DSB28-ZWUS 설치 매뉴얼 - 페이지 2

{카테고리_이름} Aeotec Z-DSB28-ZWUS에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Aeotec Z-DSB28-ZWUS 5 페이지. Home energy meter

Aeotec Z-DSB28-ZWUS 설치 매뉴얼
Step 1: Connect the Home Energy Monitor to the AC Mains
1. Turn the main breaker off and open the main circuit box panel.
2. Clip clamps of the meter around the incoming electricity cable that connects to the main circuit breaker.
Important: HEM G2 have directionality on the clamps. Please make sure that the direction of the current is going
from K to L on both clamps. Both clamps need to be consistent in the direction of the current (from K to L).
https://answers.alarm.com/ADC/Partner/Installation_and_Troubleshooting/Energy/Aeon_Labs_Home_Energy_Meter_(HEM)_...
Updated: Wed, 22 Sep 2021 15:05:11 GMT
2