Whirlpool WGD9151YW 설치 매뉴얼 - 페이지 4
{카테고리_이름} Whirlpool WGD9151YW에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Whirlpool WGD9151YW 36 페이지. Installation guide
Whirlpool WGD9151YW에 대해서도 마찬가지입니다: 사용자 설명서 (32 페이지), 사용 설명서 (8 페이지), 사용 및 관리 매뉴얼 (40 페이지)
INSTALLATION REQUIREMENTS
TOOLS AND PARTS
Gather the required tools and parts before starting installation.
Tools needed for all installations:
Flat-blade screwdriver
1/4" and 5/16" nut driver
(recommended)
Tape measure
Utility knife
Caulking gun and compound
(new vent installations)
4
#2 Phillips screwdriver
Level
Pliers
Tin snips (new vent
installations)
Adjustable wrench that
opens to 1" (25 mm) or
hex-head socket wrench
Tools needed for gas installations:
8" or 10" pipe wrench
Pipe-joint compound
resistant to LP gas
Parts supplied:
Parts package is located in dryer drum. Check that all parts
are included.
NOTE: Do not use leveling legs supplied with dryer if installing
with a pedestal or a stack kit.
Leveling legs (4)
Short inlet hose
(steam models only)
Rubber washers
(steam models only)
Parts needed:
(Not supplied with dryer)
■
Vent clamps
■
Vent elbows and ductwork
Additional parts may be required, depending in your installation.
Check local codes. Check existing electrical supply and venting.
Read "Electrical Requirements" and "Venting Requirements"
before purchasing parts.
8" or 10" adjustable wrench
(for gas connections)
"Y" connector
(steam models only)
Long inlet hose
(steam models only)