Whirlpool WGD9151YW Manual de instalação - Página 4

Procurar online ou descarregar pdf Manual de instalação para Secador Whirlpool WGD9151YW. Whirlpool WGD9151YW 36 páginas. Installation guide
Também para Whirlpool WGD9151YW: Manual do utilizador (32 páginas), Manual de instruções (8 páginas), Manual de utilização e cuidados (40 páginas)

Whirlpool WGD9151YW Manual de instalação

INSTALLATION REQUIREMENTS

TOOLS AND PARTS

Gather the required tools and parts before starting installation.
Tools needed for all installations:
Flat-blade screwdriver
1/4" and 5/16" nut driver
(recommended)
Tape measure
Utility knife
Caulking gun and compound
(new vent installations)
4
#2 Phillips screwdriver
Level
Pliers
Tin snips (new vent
installations)
Adjustable wrench that
opens to 1" (25 mm) or
hex-head socket wrench
Tools needed for gas installations:
8" or 10" pipe wrench
Pipe-joint compound
resistant to LP gas
Parts supplied:
Parts package is located in dryer drum. Check that all parts
are included.
NOTE: Do not use leveling legs supplied with dryer if installing
with a pedestal or a stack kit.
Leveling legs (4)
Short inlet hose
(steam models only)
Rubber washers
(steam models only)
Parts needed:
(Not supplied with dryer)
Vent clamps
Vent elbows and ductwork
Additional parts may be required, depending in your installation.
Check local codes. Check existing electrical supply and venting.
Read "Electrical Requirements" and "Venting Requirements"
before purchasing parts.
8" or 10" adjustable wrench
(for gas connections)
"Y" connector
(steam models only)
Long inlet hose
(steam models only)