Clark-Reliance Jerguson LumaStar EPL-100 설치, 운영 및 유지보수 지침 매뉴얼 - 페이지 4
{카테고리_이름} Clark-Reliance Jerguson LumaStar EPL-100에 대한 설치, 운영 및 유지보수 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Clark-Reliance Jerguson LumaStar EPL-100 12 페이지.
Clark-Reliance Jerguson LumaStar EPL-100에 대해서도 마찬가지입니다: 설치, 운영 및 유지보수 지침 매뉴얼 (12 페이지)
Figure 4
Figure 5
Step 3: While holding the top bracket in place, grab the thumb nut end of the cable, wrap around entire gauge and thread
onto the stud until the bracket is secure. When wrapping the cable around the gauge, make sure to feed the cable above the
bolt as shown above in Figure 5. Snug the cable and secure the thumb nut, but do not fully tighten the thumb nut at this
time.
Figure 6
nd
Step 4: Align bottom bracket, using the 2
bolt if possible. Wrap thumb nut end of the cable around the entire gauge and
begin to thread. Pull the cable loop as tight as possible and fully tighten the thumb nut down as shown in Figure 6. The
lower bracket should now be tight and secure.
16633 Foltz Parkway ● Strongsville, OH 44149 USA ● Telephone: +1 (440) 572-1500 ● Fax: +1 (440) 238-8828
www.clark-reliance.com ● [email protected]