Clarke IQ2000S 조립 및 작동 지침 - 페이지 6
{카테고리_이름} Clarke IQ2000S에 대한 조립 및 작동 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Clarke IQ2000S 13 페이지. Infrared quartz heater
ASSEMBLY & OPERATION
Unpack the heater and check for any damage sustained in transit. Notify your
Clarke dealer immediately of any defects.
The heater is resistant to splashing but should be sheltered from direct rainfall,
as should the power cable, plug and supply outlet socket. A awning,
overhanging roof or other shelter should be used to protect from rain.
The heater should be positioned with at least 1 m clearance from any
combustible surfaces including furniture or other fabrics which could be
damaged by heat.
Ensure the heater faces the centre of
the space to be heated.
Never place any objects on, or
against the heater.
1. Set the lower tube (1) through the
hole in the base (2) with the
welded disc downwards & the
locating tongue in its seat in the
base. Secure with the washer (3)
and hand screw (4).
2. Connect tube (5) to the lower
tube (1) and secure with the two
screws.
3. Remove the screw (10) from the
end of the small tube (8) and
remove the locking ring (7) from
tube (6).
4. Slide the small tube (8) up through
the tube (6) (end with drilled hole
first), until it emerges from the
other end.
5. Screw the locking ring (7) back on
to tube 6.
6. Connect tube (6) to tube (5) and
secure with the two screws.
Parts & Service: 020 8988 7400 / E-mail: [email protected] or [email protected]
6