DISCOVER 950-0025 사용자 설명서 - 페이지 12
{카테고리_이름} DISCOVER 950-0025에 대한 사용자 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. DISCOVER 950-0025 18 페이지. Sma sunny island
• AES LiFePO
48 V batteries sold before Jan 1, 2020, will not supply power to LYNK II
4
using the network cable connection. An external 13-90 VDC power source connected
to the Phoenix 12-pin connector on LYNK II is REQUIRED for the AES LiFePO
batteries listed below.
• 42-48-6650 with a serial number before DET424820275xxxx
LYNK II and HELIOS ESS batteries are both internally terminated. When installing
LYNK II with Helios batteries, no external termination is required.
6. ENABLING LYNK II TO COMMUNICATE WITH SMA SUNNY ISLAND
DEVICES
When properly connected to a closed-loop network and set to use the CANbus
protocol, LYNK II will transmit real-time parameters from the Discover Lithium
battery, including voltage, current, temperature, state of charge, and fault conditions
to the SMA network. LYNK II will also transmit charge voltage and current requests
from the Discover Lithium battery to devices on the SMA network.
LYNK ACCESS software for 64-bit Windows 10 is required to configure LYNK II
settings for closed-loop communication with devices on a CANbus network.
6.1 Connecting LYNK II to the SMA Network
Connect the LYNK II Gateway CAN out port to the 'ComSync In' port on the Sunny
Island inverter-charger using a CAT5 cable. Terminate the ComSync communication
bus at both ends. The LYNK II Communication Gateway is internally terminated.
Sunny Island ComSync In Port RJ45 Pin configuration:
1. Sync1 - reserved
2. CAN_GND
3. SYNC_H
4. CAN_H
5. CAN_L
6. SYNC_L
NOTE
Figure 4. Helios
12
4