displayit Flare 조립 지침 매뉴얼 - 페이지 6

{카테고리_이름} displayit Flare에 대한 조립 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. displayit Flare 6 페이지. 20' (230” x 92”)

!
Failure to follow packing instructions
may result in damaged items.
Box #3 - Round Support Poles
Box #1 - 4 Curtain Lights
Two curtain lights stacked
1. Carefully lay two curtain lights
on top each other and roll them
up together.
Wrap foam around the
roll.
4. Pack the small hardware
items into the two canvas
bags. These bags along
with the feet, power
supplies, and power cord
fit into the final box.
displayit.com
Packing Instructions
Frame perimeter metal pieces with foam between
2A. Insert the vertical support
pole into one of the boxes.
2B. Insert one double curtain roll
into the bottom of the box.
2C. Put the second double
curtain roll in the top of the box.
2D. Repeat to pack the last four
curtain lights in the second box.
5. Frame perimeter pieces pack on their edge with foam between.
6. After all hardware is in the case, put a foam sheet on top.
7. Fold the graphics up and place them into plastic bags.
Store them in the case on the top level above the foam sheet.
800.207.0311
After-Hours Emergency: Call or Text 678.723.5343
20' (230" x 92") Flare
Assembly Instructions Page 6
Box #4 - Power Supplies, Feet,
wires, & Small Hardware
Box #2 - 4 Curtain Lights
3. Vertical support poles go
into box #3.
Short foam
on ends
Short foam
on ends
Flare v3.2 Updated 9/4/2019