CAME FROG-PM4 설치 매뉴얼 - 페이지 10
{카테고리_이름} CAME FROG-PM4에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. CAME FROG-PM4 13 페이지. Swing-gate operator
CAME FROG-PM4에 대해서도 마찬가지입니다: 설치 매뉴얼 (19 페이지), 설치 매뉴얼 (17 페이지), 사용 설명서 (12 페이지)

Manual release of the leaf
Insert the key/lever into the release lock and turn it counter-clockwise. Open the leaf until end run
To relock the door, return it to its closed position.
7 Maintenance
Periodic maintenance
Before doing any maintenance, cut off the power supply, to prevent any hazardous situations caused by accidentally activating the operator.
☞
Periodic maintenance log kept by users (every six months)
Date
Extraordinary maintenance
The following table is for logging any extraordinary maintenance jobs, repairs and improvements performed by specialized contractors.
⚠
Any extraordinary maintenance jobs must be done only by specialized technicians.
Extraordinary maintenance log
Installer's stamp
Job performed
______________________________________________________________________________________
__________________________________________________________________________________________________
______________________________________________________________________________________________
www.metalines.com
Notes
Name of operator
Job performed on (date)
Technician's signature
Requester's signature
Signature