Aerisa AerBrush 03 설치, 운영 및 유지보수 매뉴얼 - 페이지 3
{카테고리_이름} Aerisa AerBrush 03에 대한 설치, 운영 및 유지보수 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Aerisa AerBrush 03 4 페이지.
ELECTRICAL INSTALLATION INSTRUCTIONS
Warning: Do not connect to power before installation is complete. Always disconnect power to the unit
before handling the ionizer.
1. All field wiring to be in accordance with NEC and Authorities Having Jurisdiction (AHJ).
2. Connect power to ionizer using appropriate voltage per the following. See figure 3.
AerBrush-01=12V DC
AerBrush-02=24V AC
AerBrush-03=120V AC
AerBrush-04=230V AC
3. For 120V AC and 230V AC models the installer shall provide a grounding method per the local AHJ.
4. For best results interlock ionizer with fan relay.
5. Apply power to unit. Confirm that green indicator light illuminates indicating that the ionizer is
functioning properly.
OPERATION
1. When power is supplied to the ionizer, the ionizer will be activated and will illuminate the green ion
indicator light.
2. The ionization unit is self-balancing and does not require any type of adjustment.
TROUBLESHOOTING
If the unit is not working, check the following:
1. The supply fan is running and that the green light illuminates.
2. Check the power input connections to the ionization unit. Verify all connections are correct and
tightened. Reconnect any loose wires as necessary.
Aerisa
1214 W. Boston Post Road, Suite 410, Mamaroneck, NY 10543
Tel: 480-302-6300
www.aerisa.com