Aerisa AerBrush 03 Manual de instalação, operação e manutenção - Página 3

Procurar online ou descarregar pdf Manual de instalação, operação e manutenção para Filtro de ar Aerisa AerBrush 03. Aerisa AerBrush 03 4 páginas.

Aerisa AerBrush 03 Manual de instalação, operação e manutenção
ELECTRICAL INSTALLATION INSTRUCTIONS
Warning: Do not connect to power before installation is complete. Always disconnect power to the unit
before handling the ionizer.
1. All field wiring to be in accordance with NEC and Authorities Having Jurisdiction (AHJ).
2. Connect power to ionizer using appropriate voltage per the following. See figure 3.
AerBrush-01=12V DC
AerBrush-02=24V AC
AerBrush-03=120V AC
AerBrush-04=230V AC
3. For 120V AC and 230V AC models the installer shall provide a grounding method per the local AHJ.
4. For best results interlock ionizer with fan relay.
5. Apply power to unit. Confirm that green indicator light illuminates indicating that the ionizer is
functioning properly.
OPERATION
1. When power is supplied to the ionizer, the ionizer will be activated and will illuminate the green ion
indicator light.
2. The ionization unit is self-balancing and does not require any type of adjustment.
TROUBLESHOOTING
If the unit is not working, check the following:
1. The supply fan is running and that the green light illuminates.
2. Check the power input connections to the ionization unit. Verify all connections are correct and
tightened. Reconnect any loose wires as necessary.
Aerisa
1214 W. Boston Post Road, Suite 410, Mamaroneck, NY 10543
Tel: 480-302-6300
www.aerisa.com