Balmar SG205 설치 및 운영 매뉴얼 - 페이지 7
{카테고리_이름} Balmar SG205에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Balmar SG205 19 페이지. Battery monitor

Installing the Deutsch-Style Connector
View this video on how to install the Deutsch-style connectors:
https://www.youtube.com/watch?v=HHpg5b8hdu8&t=3s
The receptacles for the connector come pre-terminated onto each wire. They
must be installed into the connector as shown below.
1. Slide the heat shrink tubing over the bare wires.
2. Slowly push the receptacle into the appropriate hole, until a clicking sound
is heard. Even though the holes look too small to accept the sockets they
will fit, with the material expanding to form a seal around the sockets.
Position
1
2
3
4
3. Inspect the receptacle from the face of the connector. The receptacles
should be flush with the face of the connector
4. Install the wedgelock into the face of the connector. It will click into place.
5. Heat up the heat shrink tubing to lock it into place. The tubing is not
needed for water tightness, but does provide chafe protection to the
exposed wires.
When the wedgelock is in place, you should just be able to see the ends of
the receptacles through the wedgelock. You can refer to the factory-installed
connector for guidance.
NOTE: When initially inserting the connector into the SmartShunt
receptacle a light application of grease to the connector's
rubber seal will reduce the force needed for insertion.
12
Color
Green
White
Red
Black
Adding an Additional Device to the SmartLink Network
You may add additional Displays and/or SmartShunts to the SmartLink
Network, up to total of 32 devices. Most SmartLink devices have two con-
nectors available to allow you to extend the network in either direction. The
network design is a simple, point-to-point network. Do not create a loop
SG200 Layout and Operation
SG200 Layout and Operation
The SG200 has three main data display areas, as shown below.
Single Button Operation
The SG200 has a single button for ease of operation. A button press can
be:
1. Short Press
2. Long Press (release as soon as screen flashes)
3. Extra-Long Press (about three seconds until checkerboard pattern
shows: performs a network reset)
Short presses take you from one item on the screen to another. For
instance, if the screen is showing Voltage, a single short press will change
the screen to show Current in amperes.
A long press is used to make a selection or enable the editing of a value.
As soon as you see flashing on the screen, you have made a long press
and cab release your finger.
13