Coil connections

Coils of BAC ice thermal storage units are filled with a low pressure inert gas at the factory before shipping, to
ensure an optimal internal corrosion protection. It is recommended to check the overpressure every six months
(connect a manometer to the valve).
On site, the pressure needs to be released from the coil. Remove the plug first before opening the pressure relieve
valve.
Threaded coil connection on ice thermal storage
CAUTION
Once the coil is no longer protected by the inert gas, proper actions against corrosion must be
taken on site.

Freeze protection

These products must be protected against damage and/or reduced effectiveness due to possible freeze-up by
mechanical and operational methods. Please contact your local BAC Balticare representative for recommended
protection alternatives.

Safety precautions

All electrical, mechanical and rotating machinery constitutes a potential hazard, particularly for those not familiar
with its design, construction and operation. Accordingly, adequate safeguards (including use of protective
enclosures where necessary) should be taken with this equipment both to safeguard the public (including minors)
from injury and to prevent damage to the equipment, its associated system and the premises.
If there is doubt about safe and proper rigging, installation, operation or maintenance procedures, contact the
equipment manufacturer or his representative for advice.
When working on operating equipment, be aware that some parts may have an elevated temperature. Any
operations on elevated level have to be executed with extra care to prevent accidents.