ClearSpan 104903 조립 지침 매뉴얼 - 페이지 9
{카테고리_이름} ClearSpan 104903에 대한 조립 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ClearSpan 104903 19 페이지. Premium solar star greenhouse
Dashed line below shows where the trim of the upper
panel overlaps the top of the doorframe.
Retighten (Step 21)
19. Align the edges and ends with the lower panels and
secure the triangular panel using flat brackets. See
the diagrams above.
20. Secure the ends of each triangular panel to the
lower panels using 3/4" Tek screws and neo-bonded
washers. See Figure 1 (previous page).
21. Retighten the screws to secure the polycarbonate to
the frame of the triangular panel above the door.
DO NOT SECURE THE DOOR TO THE ASSEMBLED
FRAME AT THIS TIME.
22. Move to the inside of the frame and measure the
distance between the base rail at both ends and in
the middle. See the arrows below.
Top View of Frame
ATTENTION: Use a tie-down strap and ratchet (not
included) to keep the center of the base in place. See
Visit www.ClearSpan.com for additional products and customer assistance.
photo insert in the previous diagram. Remove strap after
installing the roof panels.
The distances indicated by the arrows in the previous
diagrams must be equal before you continue. The metal
base will move outward when the roof panels are
installed if the frame is not secured.
23. Once the greenhouse is assembled to this point,
return to each tube splice on the metal base frame
and install a Tek screw through the tubes at each
splice to secure the joint. This prevents separation of
the metal base frame.
Base Frame Tubes
24. Return to each pass-through connector and secure
these to the base rail before you continue.
25. After securing the base frame tube joints and pass-
through connectors, square the frame by measuring
diagonally from corner-to-corner.
Dashed line shows where to
add a tie-down strap to keep
the base rail from spreading.
View is from the top looking down on the frame.
3/4" Tek
Screw
8 of 18