Arthur Grillo DPC200-R 설치 및 운영 매뉴얼 - 페이지 7
{카테고리_이름} Arthur Grillo DPC200-R에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Arthur Grillo DPC200-R 16 페이지. Airflow / pressure controller
4.
Start up
4.1 Overview DPC200-R
1.
Front cover
2.
Cable gland M16 x 1.5
3.
Pressure connection 1
4.
Pressure connection 2
5.
Cable gland M16 x 1.5
4.2 Schematic view inside
Button T1 and T2 serve for the operation of the menu
4.3 Pressure connections
Connect all pressure connections properly with plastic tubing (inner diameter 5 or 6 mm).
Button T1
Doc.-no.: DPC200-R_02_EN
1.
3.
2.
4.
Button T2
Issue: 06/2018
START UP
5.
7