ALUZ A1-ZIBI-STN-DWH 매뉴얼 - 페이지 11
{카테고리_이름} ALUZ A1-ZIBI-STN-DWH에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ALUZ A1-ZIBI-STN-DWH 13 페이지.
1
Determine number of reflectors needed. Reflectors are available in
1', 2', 3', or 4' increments. Specify total length of reflectors needed.
2
Position reflectors on luminaires, then install 3 set screws on each
reflector segment to secure in place. Do not over-tighten set screws
1170 N Red Gum St, Anaheim, CA 92806
aluz.lighting
© ALUZ All Rights Reserved. ALUZ reserves the right to make changes or withdraw specifi cations without prior notice.
A1 Series | Surface
ZIBI Standard Dynamic White
(A1-ZIBI-STN-DWH)
866.ALUZ.LTG | 714.535.7900
3
If applicable, connect disconnects between luminaires. Slide
shrink tube over connectors and apply heat. The shrink tube will
shrink down, sealing the connectors. Apply silicone around sealed
connectors for a stronger seal.
4
Mount luminaires at least 12" away from the wall.
Page 11 of 13
Reflector (A1-ZIBI-STN-RE1)
12"
Installation Instructions
9 / 11 / 2023 / Rev 4