Alva GDH100 매뉴얼 - 페이지 8

{카테고리_이름} Alva GDH100에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Alva GDH100 18 페이지.
Alva GDH100에 대해서도 마찬가지입니다: 매뉴얼 (17 페이지)

Before placing the hob in the counter cut out, the supplied foam
sealing strip must be attached to the underneath of the lip of the
hob. This prevents dirt and moisture from the counter top seeping
under the hob.
After installation the space under the hob must be at least 30mm.
The distance between the hob and the wall must be at least 35mm.
If an extractor hood is to be used the distance between the top of
the gas hob and the bottom of the hood must be at least 650mm.
If this appliance is not being installed in a built-in structure, there
should be an insulation layer between the appliances bottom and
other components
LPG (Liquid Petroleum Gas) installation
Soak the end of the gas-supply hose in hot water to soften it.
Then push the hose end fully over the gas-supply nozzle located
at the rear of the hob (see picture below).
Secure the hose by tightening the hose clamp (see sketch below)
Similarly, secure the other end of the hose to the regulator on the
gas bottle.
6