Acqua SPLASH 1/2008 유지 관리 일정 - 페이지 2
{카테고리_이름} Acqua SPLASH 1/2008에 대한 유지 관리 일정을 온라인으로 검색하거나 PDF를 다운로드하세요. Acqua SPLASH 1/2008 2 페이지. Surface-mounted aerator
Biennial (Two-Yearly) Maintenance
Every two years it is important to inspect the primary and secondary seals, and the motor bearings for
wear. These need to be replaced if necessary. Please refer to Acqua & Co. Aeratore Splash 2001 1hp 2
ed. 04/04 Diagram and Spare Parts List for reference as required.
a)
Perform the Annual (Yearly) Maintenance steps a) to c) as instructed.
b)
Separate motor housings.
c)
Remove the rotor (part no. 1) complete with bearings (2 x Part No. 28).
d)
Inspect the bearings (Part No. 28) for wear and damage. Replace as necessary.
e)
Re-assemble motor housings, replacing O-ring (Part No. 51).
f)
Perform the Annual (Yearly) Maintenance steps d) to e) as instructed.
o
02/2007
Page 2 of 2