ASGCO BC-2 설치, 작동 및 유지보수 지침 - 페이지 7

{카테고리_이름} ASGCO BC-2에 대한 설치, 작동 및 유지보수 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. ASGCO BC-2 9 페이지. With bolt-up tensioner system

ASGCO BC-2 설치, 작동 및 유지보수 지침
BC-2™ INSTALLATION
OPERATION CONT.
Adjust the short arms up so that the tips contact the belt. Tighten all set screws and jam nuts
completely.
Ensure the blade tip is contacting the belt and then tighten lock nuts on the blade tips.
Adjust the rear blade tips so that they are fully contacting the belt surface and tighten the lock nuts.
Once belt contact has been made, tighten the adjustment angle lock bolt. Turn the adjustment bolt
until the blade tip has moved about ¼". Tighten the tube clamp lock bolts.
Test run the conveyor. If chattering occurs, loosen the tube clamp bolts and rotate the mounting tube
in the direction of belt travel.
5
BC-2
w/Bolt-Up
Tensioner