Blueridge BM18MCC 설치 매뉴얼 - 페이지 15
{카테고리_이름} Blueridge BM18MCC에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Blueridge BM18MCC 18 페이지. Ceiling cassette indoor air handler
CAUTION
•
Install the drain lift pipes no higher than 21".
•
Install the drain lift pipes at a right angle to the indoor unit and no more than 12" from the unit.
•
To prevent air bubbles, install the drain hose level.
•
The incline of drain hose should be no more than 3"so that the drain socket does not have to
withstand additional force.
•
To ensure a downward slope of 1:100, support the drain line every 3'.
•
When unifying multiple drain pipes, install the pipes as shown in figure below. Select
converging drain pipes whose gauge is suitable for the operating capacity of the unit.
•
Do not connect the drain piping directly to sewage pipes that smell of ammonia. The
ammonia in the sewage might enter the indoor unit through the drain pipes and corrode the
heat exchanger.
Unit: mm
Revised 5/14/2020
T-Joint converging drain pipes
T-Joint converging drain pipes
Fig 6.4
6.4 Test the drain piping
After the piping work is finished, check if drainage
flows smoothly.
Water
receiver
Fig 6.5
When electric wiring work is finished, check
drainage flow during COOL running, explained in
"Test operation".
4.2in
3in
2.6in
Fresh air intake 2.6in
Page 15