Astor-Bannerman ABW6 Owner's Manual & Installation Manual - Page 8
Browse online or download pdf Owner's Manual & Installation Manual for Bathroom Fixtures Astor-Bannerman ABW6. Astor-Bannerman ABW6 12 pages. Height adjustable basin
COLD
SUPPLY
•
Ensure the free end of the supply hoses are passed through the recess in the bottom left hand
side of the carcass of the rise and fall unit.
Connect the end of the supply hoses with the Conex fitting to the tap connectors.
Fit the tap levers:
•
Remove the handle caps, to reveal the fixing screws; fit the spline adaptors and levers to the tap
bodies. Care should be taken to ensure that the lever assemblies do not foul the tap bodies. If a
lever fouls the tap body, it needs to be adjusted. To do this, release the large brass nut on the
underside of the basin, tighten the chrome ring fitted to the tap body until sufficient clearance is
achieved. Once fully adjusted, re tighten the large brass nut.
Test the water supply:
Ensure the isolation valves are CLOSED. Place a bucket or suitable container below the plug hole
•
of the basin. Open both basin taps fully and then slowly open each of the isolation valves, wait
minutes, then examine the supply system for leaks, correct as necessary. Close the isolation
valves.
Fit the white plastic lower cover:
•
Remove the mushroom heads from the plastic rivets and place aside, fit the bodies into the six
HOT
SUPPLY
Touch tap
control
box
Hoses
Rear view
holes in the frame
•
Remove the P Trap and straight coupling from
the waste assembly
•
Feed the free end of the flexible hose through
the cut out in the lower right hand side of the
frame, leave the waste assembly in position
sccure with cable tie supplied.
•
Fit the lower cover taking care to position it
correctly
•
Refit the rivet heads, push each of the
mushroom portions of the white plastic rivets
Page: 8
Version 3 : 01-04-016