AMQ Cluvo Manual - Page 12
Browse online or download pdf Manual for Indoor Furnishing AMQ Cluvo. AMQ Cluvo 13 pages.
Cable Management
When installing equipment, either on the worksurface or below, be sure that the connecting cables are free
from obstruction. This product offers a cable riser, cable brackets or a cable basket to help manage excess
cables/wires on the underside of the worksurface.
Workstation Design Tips
•
Ensure that power cords for all accessory items – computer, lights, monitors, etc. - ar
to reach outlets throughout the range of worksurface height adjustment is taking place.
•
Always check for proper operating clearance before placing any item on, above or below the worksurface.
Maintenance and Cleaning
Regularly clean dust and dirt from lifting columns. To ensure all surfaces are thoroughly cleaned, make sure the
lifting columns are fully extended to their maximum height. Also, be sure to inspect cables and lifting columns
for damage. Check all connections for both correct function and secure mounting.
Caution:
Damp cloth is recommended. To protect the painted surfaces, use a cleanser that is not highly alkaline
or acidic. A pH-neutral product is ideal.
Note:
Please do not move the desk without help. Refer to the guidelines at the end of the assembly instructions,
or contact your facilities group for assistance.
Cluvo User / Troubleshooting Guide | 12
amqsolutions.com