Draper SLX14 Installation And Operation Manual - Page 3

Browse online or download pdf Installation And Operation Manual for Projection Screen Draper SLX14. Draper SLX14 7 pages. 230v ac scissor lift slx video projector lift
Also for Draper SLX14: Brochure & Specs (16 pages), Installation & Operating Instructions Manual (7 pages), Installation & Operation Instructions (8 pages), Installation & Operating Instructions (4 pages), Installation & Operating Instructions Manual (7 pages)

Draper SLX14 Installation And Operation Manual
Scissor Lift SLX by Draper
Installing Projector Using Universal Projector Mount
The universal projector mount includes:
-2 x long arms
-4 x short arms
-4 x M3, 4 x M4, 4 x M5 and 4 x M6 mounting bolts (30mm in length)
5
-4 spacers (½" [13 mm],
/
" [16 mm], ¾" [19 mm],
8
① Determine which size mounting bolts suit your projector, and set others
aside. They are no longer required. If your projector has only three
mounting holes, set aside one of the mounting arms (see Fig. 3).
② Attach the appropriate mounting arms to the rectangular plate via center
bolt. Spread out the arms so each end is over one of the mounting holes.
③ Connect projector mounting arms.
④ Tighten the mounting bolts.
⑤ Use the ¼" (6.35 mm)-20 bolts and springs which hold the rectangular
plate to the bottom pan to adjust roll and tilt (the springs will ensure that the
projector is held still during motion). The center
Yaw adjustment (see Fig. 4).
¼" (6.35 mm)-20
Bolt and Washer
Installing Optional Ceiling Closure
If your Scissor Lift SLX is equipped with optional ceiling closure, it can be used
as is, or in conjunction with a square of existing ceiling tile (see Fig. 5).
① If installing with ceiling tile, you may need to cut tile so that its overall
dimensions are the same as (or slightly less than) the closure panel. Place tile
into trim frame. Lay closure panel on top (back side) of ceiling tile, and tighten
screws to hold in place.
② Attach provided angle brackets to side of Bottom Panel of Scissor Lift SLX.
③ Attach
5
/
" threaded rods to angle bracket.
16
④ Run unit "up" until bottom pan stops at highest position. Mark po si tion on
rods even with ceiling level and cut to length (remove from pan if convenient).
⑤ Run unit "down" until bottom pan stops at "show" position.
5
⑥ Attach closure to lower end of
/
16
secure with nuts above and below slots.
Caution: Make sure nuts are completely tightened.
⑦ Run unit "up" again to highest position. Measure distance by which panel fails to
reach required "closed" height for sur round ing ceil ing.
⑧ Run unit "down" then re-adjust mounting of
panel required distance.
⑨ Test unit operation to confi rm that panel will stop in closed position just before
touching ceiling.
Caution: DO NOT hang from, "ride" or pull down on the unit. This could
create a failure and cause damage and/or injury.
PLEASE NOTE: Immediately upon completion of the surrounding ceiling,
unit should be operated to confi rm that optional ceiling closure panel by
1
Draper or by others stops
/
" short of touching ceiling in closed position.
8
If closure panel touches, the motor may continue operating after the lift is
closed. If it continues to cycle once the lift is closed, a motor failure may
occur.
7
/
" [22 mm])
8
5
/
" (8 mm) bolt provides
16
Detail: ¼" (6.35 mm)-20
bolts and Spring
Spring
Figure 4
" rods by slipping into four corner slots and
5
/
" rods in traveling grid to raise
16
www.draperinc.com
7
4
5
7
Item Qty
Part Number
1
C028.546
1
C044.181.07SA
2
C002.845.07SA
4
C077.035.49
8
C013.050
8
C020.082
16
C018.027
4
C020.322
4
C018.045
Installing Optional Ceiling Trim Kit
The Scissor Lift SLX is available with a ceiling trim kit, which consists of
the lower section of the Environmental Air Space Housing and the optional
closure panel
(see Fig. 6).
➀ Install Scissor Lift SLX as previously described in these instructions.
➁ Install bottom section of Environmental Air Space housing and Trim Ring in
opening. This can be accomplished by suspending with wire, or by mounting
directly to the ceiling joists (if space permits).
➂ Install projector and attach optional ceiling closure to Scissor Lift SLX,
according to the instructions included in this document.
5
/
"
16
Trim Ring
(765) 987-7999
9
8
2
Description
Frame, SLX Closure Trim
Panel, SLX Assembled Closure
Bracket, SLX Closure
3
7
Rod
/
"-16 x 17
/
" L Threaded , Zinc
8
8
Washer .375 I.D. x .875" O.D.
x .064" TK GRD 2 Zinc Flat
Screw, 10-16 X ½" 6 Lobe
Truss Head AB E-White
3
Nut,
/
"-16 Hex GRD 2 NSF
8
5
Screw,
/
"-18 x ¾" Long Grade 5 HH Zinc
16
Nut,
5
/
"-18 Zinc Hex KEPS
16
Figure 5
Lower section of
Environmental Air
Space Housing
Ceiling tile
(by others)
Figure 6
page 3 of 7
3
6
1