Draper FlexShade NEXD Installation & Operation Instructions - Page 3
Browse online or download pdf Installation & Operation Instructions for Indoor Furnishing Draper FlexShade NEXD. Draper FlexShade NEXD 6 pages. Clutch-operated small and large hardware
Also for Draper FlexShade NEXD: Instructions Installation & Operation (8 pages), Instructions Manual (8 pages), Instructions Installation & Operation (8 pages), Instructions Installation & Operation (10 pages), Instructions Manual (12 pages)
Clutch Operated FlexShade
Window shade with heavy duty clutch and 3" hardware profile. Cassette option.
Section 1 - FlexShade NEXD Mounting With Bracket
Please Note: Installer is responsible for selecting mounting hardware appropriate for site conditions.
Section 1.1 - Wall Mounting with Bracket
1. Mark wall for placement of mounting brackets.
Caution: Before mounting shades, verify measurements on card provided
with the shade, and ensure brackets are installed at correct width.
2. Drill small starter hole
(if necessary)
3. Mount brackets using appropriate fasteners for surface
4. Attach idler and operator endcap covers to mounting brackets
Section 1.2 - Ceiling Mounting with Bracket
1. Mark ceiling for placement of endcaps.
Caution: Before mounting shades, verify measurements on card provided
with the shade, and ensure brackets are installed at correct width.
(if necessary)
2. Drill small starter hole
3. Mount endcaps using appropriate fasteners for surface
4. Attach idler and operator endcap covers to mounting brackets
Section 2 - Jamb Mounting
1. Mark jamb for placement of endcaps.
Caution: Before mounting shades, verify measurements on card provided with
the shade, and ensure brackets are installed at correct width.
2. Drill small starter hole
(if necessary)
3. Mount endcaps using appropriate fasteners for surface
Please Note: Installer is responsible for selecting mounting hardware appropriate for site conditions.
Section 3 - Converting Between Ceiling and Wall Mounting Configurations
C e
C o
1. Remove
these three
screws from
Endcaps
Figure 4
in mounting surface.
(Fig.
1-A).
(Fig.
in mounting surface.
(Fig.
2-A).
(Fig.
in mounting surface.
(Fig.
3).
i l i n
g M
n fi
o u
g u
n t
r a t
i o n
2. Rotate metal
mounting plate
90° toward the
mounting
surface
NEXD
®
Into the
Wall
1-B).
2-B).
Figure 2-A
Figure 1-A
Push Endcap Covers
onto Both Endcaps
Endcap
Cover
Into the Ceiling
Push Endcap Covers
onto Both Endcaps
Endcap
Cover
Figure 3
W a
l l
C o
n fi
g u
3. Reattach
these three
screws to
Endcaps
page 3 of 6
Figure 1-B
Endcap
Endcap
Figure 2-B
Endcap Cover
Removed
M o
u n
t
r a t
i o n