BD FACSAria Startup, Qc & Shutdown Procedure
Browse online or download pdf Startup, Qc & Shutdown Procedure for Measuring Instruments BD FACSAria. BD FACSAria 9 pages.
Also for BD FACSAria: Quick Manual (5 pages)
Workflow Overview
Daily Startup Procedure for FACSAria™ Sorters
Fluidics
Turn ON
Hardware
Stream
Software
Startup
1. Turning On Hardware/Software
1
Open Air valve for Aria-2/4. Turn yellow lever on wall until it's parallel with the pipe.
1
This is not required for Aria-7
1
Aria-2/4: Turn on Aerosol Management System
2
Aria-7: Turn on Class 1 BSC by turning Fans on
and set AMS fan to 20%
2
The AMS should be operating at 20% at all times
under normal conditions. If clog occurs
Sorter Clog SOP for further instructions.
Startup, QC & Shutdown Procedure
Cleaning
&
Sort Chamber
.
FACSAria™
Optics
QC
Cell
See
Stream/Sort
QC
Accudrop
Shutdown
1
AMS On/Off
1
switch
100% evacuation
2
button
Ver.
2019-12-22
Post Sort
Cleanup/
2