DREAMS Yardley Double Ottoman Assembly Instructions Manual - Page 8

Browse online or download pdf Assembly Instructions Manual for Indoor Furnishing DREAMS Yardley Double Ottoman. DREAMS Yardley Double Ottoman 13 pages.
Also for DREAMS Yardley Double Ottoman: Assembly Instructions Manual (8 pages)

Assembly
Assembly
7
Put the slat frame on the lift mechanism,
use four sets of bolts (E), flat washers (F)
and nuts (H) to loosely fit the slat frame to
the first four holes on each side of the lift
nearest to the headboard, finger tight.
Tighten all the bolts after confirming
the metal frame is in correct position.
Frame must be in the center of bed in
length & width.
8
Lift up the slat frame, use the locking nut (G)
to fit the pistons to the lift mechanism.
Note: A small gap is left so stem can move freely.
This is normal, See the sketch.
Note: A small gap is left so stem can move freely.
This is normal, See the sketch.
Lift up the slat frame by one person with two hands.
Another one assemble the gas lift with nuts.
Don't over tighten, a small gap is left so stem can
move freely.
9
NOTE: When fully assembled and the mattress is
in position, please raise and lower the ottoman 4-5 times.
To ensure the gas pistons are fully lubricated.
Yardley Ottoman Double - Assembly Guide - Page 8
E
F
F
H
G
07
G
06
SMALL GAP
07
Adjustable Foot