DREAMS Yardley Double Ottoman Montaj Talimatları Kılavuzu - Sayfa 8
İç Mekan Mobilyaları DREAMS Yardley Double Ottoman için çevrimiçi göz atın veya pdf Montaj Talimatları Kılavuzu indirin. DREAMS Yardley Double Ottoman 13 sayfaları.
Ayrıca DREAMS Yardley Double Ottoman için: Montaj Talimatları Kılavuzu (8 sayfalar)
Assembly
Assembly
7
Put the slat frame on the lift mechanism,
use four sets of bolts (E), flat washers (F)
and nuts (H) to loosely fit the slat frame to
the first four holes on each side of the lift
nearest to the headboard, finger tight.
Tighten all the bolts after confirming
the metal frame is in correct position.
Frame must be in the center of bed in
length & width.
8
Lift up the slat frame, use the locking nut (G)
to fit the pistons to the lift mechanism.
Note: A small gap is left so stem can move freely.
This is normal, See the sketch.
Note: A small gap is left so stem can move freely.
This is normal, See the sketch.
Lift up the slat frame by one person with two hands.
Another one assemble the gas lift with nuts.
Don't over tighten, a small gap is left so stem can
move freely.
9
NOTE: When fully assembled and the mattress is
in position, please raise and lower the ottoman 4-5 times.
To ensure the gas pistons are fully lubricated.
Yardley Ottoman Double - Assembly Guide - Page 8
E
F
F
H
G
07
G
06
SMALL GAP
07
Adjustable Foot