Electrolux C240R Operating And Installation Manual - Page 16
Browse online or download pdf Operating And Installation Manual for Ventilation Hood Electrolux C240R. Electrolux C240R 20 pages. Hydro-extractor
Also for Electrolux C240R: Operating Manual (24 pages), Service Manual (41 pages)
- 1. Table of Contents
- 1. Instruction for Use
- 1. General, Safety
- 1. Procedure for Use
- 1. Maintenance
- 1. Unpacking, Open the Lid, Come with All Types
- 1. Positioning, Drains
- 2. Installation
- 2. Quality Requirements, Concreting of Foundation
- 2. Concreting, Procedure
- 2. Attachment and Fitting of Hydro-Extractor
- 2. Technical Data
- 2. Electrical Installation
- 2. Voltage Change
- 2. Test Runs
16
Voltage change
Voltage change must be done by authorized
personnel.
Some extractors have a dual voltage facility and
can be changed over in connection with
installation.
An extractor, which upon delivery is connected
for 400-415 V 3 AC (Y-connection), can be
changed over to 230 V 3 AC (∆-connection) and
vice versa
The change-over is done in the control unit.
How to change voltage:
• Remove the wire harness between the motor
1
and relay.
• Connect the supplied wire harness (B) for
2
∆-connection, (Wire harness A is for
Y-connection).
• Move the connector on the transformer from
400 or 415 V to the two pins for 230 V or vice
versa
Time-setting
3
The hydro-extraction time is pre-set to five
minutes. This time can be adjusted from three
to ten minutes, see fig 3 (C) and the table.
NB! (D) only applies to printed circuits for coin
operation.
TIME
MIN.
1
3
OFF
4
OFF
5
OFF
6
OFF
7
ON
8
ON
9
ON
10
ON
NB! The power must be disconnected before
altering the time.
Installation
SETTING
2
3
OFF
OFF
OFF
ON
ON
OFF
ON
ON
OFF
OFF
OFF
ON
ON
OFF
ON
ON
1
A
(
Y)
2
230
3
S5
S6
487 22 52 21 - Cent. 240, 260, 290, GB
B
(∆)
1967
415
440
400
1972
D
OFF
ON
C