AddEnergie SmartTWO Installation Manual - Page 7
Browse online or download pdf Installation Manual for Battery Charger AddEnergie SmartTWO. AddEnergie SmartTWO 20 pages.
Also for AddEnergie SmartTWO: Quick Start Manual (4 pages)
Pedestal
Site preparation
ANCHOR
The installer can use a prefabricated anchor
offered by AddÉnergie (part number: S2-V2-
ACCSP-01-03) or make his own using 12"
long ½" threaded rods spaced according to the
pattern shown on left.
85.7 mm
(3.375'')
85.7 mm
(3.375'')
Fig. 1:Ancrage préfabriquée /
Fig. 2: Patron d'espacement
Fig: 1: Prefabricated anchor
Fig: 2: Threaded rod spacing
Prefabricated anchor
Threaded rod spacing
9 cm
(3.5'')
2.5 cm
CONCRETE BASE
(1'')
The base can be prefabricated or made on site
using concrete formwork.
Determine the base's height (H), depth in the
ground (D) and the surface area (A) of its sole
according to the soil type and the freeze thaw
specifications of the installation area.
H / H
P / D
D
H
Use an electrical conduit of the appropriate size
with a diameter of 2'' or less to bring the electrical
cables to the center of the anchor.
The dimension of the top of the base, and the
position of the anchor shall be determined
according to the specific charging station
S / A
configuration, as detailed on the next page.
Fig. 3: Base de béton /
Fig. 3: Concrete base
Concrete base
7
© 2019 ADDÉNERGIE TECHNOLOGIES INC. ALL RIGHTS RESERVED Information and specifications contained in this document are subject to change, amendments and additions at any time, without notice