Duerkopp Adler 550-767 Installation Instructions Manual - Page 7
Browse online or download pdf Installation Instructions Manual for Sewing Machine Duerkopp Adler 550-767. Duerkopp Adler 550-767 18 pages. Engineered work station for side airbag tearing seam
Also for Duerkopp Adler 550-767: Fitting Instructions (2 pages)
2.
General and transport packing
2.1 Transport packing
2.2 Connecting the control unit (PC)
2.2.1 Check date and time
CAUTION:
The sewing unit may only be set up by trained specialist personnel.
The transport packing must be removed before setting-up.
–
Remove the safety straps and battens from the upper part of the
machine, table and frame.
–
Remove the safety block and straps from the motor.
–
Connect plug connector 1.
–
Screw on supply lead 2.
3
1
2
Attention:
After switching on the machine, check the system date 3 without fail!
–
Check the date and correct it if necessary.
–
Check the time (AM or PM) and correct it if necessary.
2
3