Duerkopp Adler 550-767 Handleiding voor installatie-instructies - Pagina 7

Blader online of download pdf Handleiding voor installatie-instructies voor {categorie_naam} Duerkopp Adler 550-767. Duerkopp Adler 550-767 18 pagina's. Engineered work station for side airbag tearing seam
Ook voor Duerkopp Adler 550-767: Montage-instructies (2 pagina's)

Duerkopp Adler 550-767 Handleiding voor installatie-instructies
2.

General and transport packing

2.1 Transport packing

2.2 Connecting the control unit (PC)

2.2.1 Check date and time

CAUTION:
The sewing unit may only be set up by trained specialist personnel.
The transport packing must be removed before setting-up.
Remove the safety straps and battens from the upper part of the
machine, table and frame.
Remove the safety block and straps from the motor.
Connect plug connector 1.
Screw on supply lead 2.
3
1
2
Attention:
After switching on the machine, check the system date 3 without fail!
Check the date and correct it if necessary.
Check the time (AM or PM) and correct it if necessary.
2
3