Dancover 2m Series Manual - Page 6

Browse online or download pdf Manual for Greenhouse Kit Dancover 2m Series. Dancover 2m Series 7 pages. Work tent
Also for Dancover 2m Series: Manual (11 pages), Manual (12 pages)

4. Assembly of legs
a) Insert (No.1) legs into an end arch one side at a time.
b) Insert (No.2) legs to the second arch.
c) Add second arch to assembly connecting (No.8) into (No.7) and
diagonal bar (No.6) with screws 2 ½" (No.12) with wing nuts
(No.13). See sketch at front page. Note: (06-374) should be
placed at last section.
d) Repeat step b) and c) until the whole shelter is completed.
e) Make sure the base is open to 2m.
f) Make sure the distances AD and BC have exactly the same
length as per illustration, lengths depends on the model.
5. Cover installation (Ties are always on the inside)
a) Place the roof in front of the shelter as illustrated.
b) Unfold as illustrated then lift onto shelter as is.
c) Place cover over the completed structure making sure that the
TRIANGLE is at the front of the garage.
d) Attach all straps inside the roof ot the structure poles going
completely around the garage.
e) Tie firmly inside ties to bars.
6. Anchoring garage.
a) Place your garage in the final position you want then close the
doors, front and back if supplied before anchoring, anchor with
brackets (No.9) and nail (No.10) as per diagram on the first
page. Drive anchor into ground.
b) Fix flap to your house (if applicable).
2m
A
C
B
D