airwave Air Boy nano4 Operation Instruction Manual - Page 11
Browse online or download pdf Operation Instruction Manual for Aircrafts airwave Air Boy nano4. airwave Air Boy nano4 20 pages.
OPERATING INSTRUCTIONS
4. Air Cushion production
After you have inserted the film and set the parameters (page 6) temperature, air volume,
speed according to the type of film - press the "START" button to start film production and
check the air filling quantity and sealing result at the same time. If necessary, adjust the
temperature and air volume according to the actual situation (room temperature etc. can
be determining)
5. Break
The machine will stop automatically after running for the preset time, or you can manually
press "STOP" button to stop working when the machine running. The remaining time will
not be reset, only after turning off the machine.
Adjustments with control panel
1. Speed adjustment
After pressing START machine is working with the last preset data. Pressing SPEED you
choose the different speeds V1 – V4. Please adjust the speed according to page 6.
2. Temperature adjustment (T)
Temperature setting is on the left side of panel. Pressing the "+" button increases the
temperature; pressing the "-" button decreases. Press one time means increase or
decrease 1 level. Continuous pressing rapidly increases or decreases. (Please decrease if
there are holes in the sealing bags; please increase if sealing is not very strong)
3. Air volume adjustment (F)
Air volume setting is on the right side of panel. Pressing the "+" button increases the air
volume; pressing the "-" button decreases. Press one time means increase or decrease 1
level.
Speed, temperature (T) and air volume (F) can be changed during the film production.
10