Additel ADT927 Maintenance Instructions Manual
Browse online or download pdf Maintenance Instructions Manual for Water Pump Additel ADT927. Additel ADT927 7 pages. Hydraulic pressure test pump
Also for Additel ADT927: User Manual (2 pages), User Manual (2 pages), Maintenance And Repair Manual (15 pages)
Preparation for maintenance or repair service.
1. Open vent valve and isolation valve,(Counterclockwise) push the
liquid out of piston cavity by turning the pre-pressurization wheel
clockwise until it is completely in.
2. Drain the liquid media out of the pump.
3. Close the isolation valve by turning clockwise until closed.
4. Close vent valve by turning clockwise until closed.
Vent Valve
Isolation Valve
Maintenance Instructions
(ADT927)
High-pressure
pressurization handle
Pre-pressurization
wheel