Additel ADT927 Manuel d'instructions de maintenance
Parcourez en ligne ou téléchargez le pdf Manuel d'instructions de maintenance pour {nom_de_la_catégorie} Additel ADT927. Additel ADT927 7 pages. Hydraulic pressure test pump
Également pour Additel ADT927 : Manuel de l'utilisateur (2 pages), Manuel de l'utilisateur (2 pages), Manuel d'entretien et de réparation (15 pages)
Preparation for maintenance or repair service.
1. Open vent valve and isolation valve,(Counterclockwise) push the
liquid out of piston cavity by turning the pre-pressurization wheel
clockwise until it is completely in.
2. Drain the liquid media out of the pump.
3. Close the isolation valve by turning clockwise until closed.
4. Close vent valve by turning clockwise until closed.
Vent Valve
Isolation Valve
Maintenance Instructions
(ADT927)
High-pressure
pressurization handle
Pre-pressurization
wheel