Duro Dyne 27184 Owner's Manual - Page 11
Browse online or download pdf Owner's Manual for Industrial Equipment Duro Dyne 27184. Duro Dyne 27184 16 pages. Automatic bulk feed pinspotter
INSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS
1)
For the Mach 70-
Connect the Power Pack to a source of 208-230 V 60 Amp. power. This service should be connected to
a 60 amp disconnect box fitted with 60 amp slow blow fuses. The Power supply line to the Power Pack
pigtail should be #6 (or heavier) wire to minimize voltage losses. The black and white wires are the power,
the green is ground. Select the closest match to the Power Supply (either 208V or 240V) at the Incom-
ing Voltage Selector Switch in the Component Module.
2)
Attach the Footswitch to the Footswitch Receptacle on the rear of the Power Pack.
3)
Connect the air line to the Regulator. Adjust the regulator pressure to 80-85 PSI.
4)
Plug the Vibrator Line Cord into the socket on the rear of the Control Console.
TECHNICAL SPECIFICATIONS
Mach 70
AIR REQUIREMENTS:
Input pressure 80 PSI.
ELECTRICAL:
Input voltage: 208-230 V 60 HZ
single phase. 60 amp service
Fuse for 60 amps. using slow blow fuses
- 11 -