Duscholux CPL1 Operating Instructions Manual - Page 7

Browse online or download pdf Operating Instructions Manual for Hot Tub Duscholux CPL1. Duscholux CPL1 19 pages. Whirlpool

BEFORE USE

Switch the mains isolation switch on and fill the whirlpool.

AFTER USE

Cleaning and blowing-out
Empty the whirlpool. A blow-out program starts automatically about 15 min later to dry the pipes.
Switch off the mains cut-off switch once the automatic blow-out program has finished.
The tub should be cleaned every time it is used. We recommend our Duscholux tub cleaner, available
from plumbing supply dealers. The blow-out program can also be started manually if required:
switch on the all-phase mains cut-off switch,
press the air system button and let the air system run for approx. 2 min.
Disinfection
Duscholux whirlpool disinfectant is ideal for disinfection. For more information on
the disinfectant and how to handle it, see the bottle label / instruction leaflet,
or ask your plumber or service technician.
You can also use the following overview to determine the amount of disinfectant required for your
bath tub:
Disinfectant dose per 100 litres bath water
(Water volume in accordance with supplier specifications)per 100 litres of water (water volume)
for initial treatment approx. 375 ml
Legionella prevention approx.110-150 ml
Ongoing disinfection (about once per week) approx. 100 ml
Germ infestation and special disinfection* approx. 650 ml
*Special disinfection
Every 10th disinfection process should be carried out as a special disinfection.
This prevents resistance to the disinfectant developing.
7