DBK Drymatic Boost Bar FGPH109 Instruction Manual - Page 10
Browse online or download pdf Instruction Manual for Dryer DBK Drymatic Boost Bar FGPH109. DBK Drymatic Boost Bar FGPH109 16 pages. Adaptable heat drying system
Also for DBK Drymatic Boost Bar FGPH109: Instruction Manual (18 pages)
Fitting Adaptors:
All the adaptors can be secured using the latches fitted to the Boost Bar outlet and the accessories.
A) 4-Port Adaptor (4")
The Drymatic Boost Bar 4-Port Adaptor is designed to split the heated airflow into 4 separate channels; these can then be
diverted into other rooms within a property or into separate drying chambers, voids, or cavities.
Step 1 — Connect Adaptor
Take the adaptor and slide it into the outlet of the Drymatic Boost Bar. The adaptor will locate itself between the ribbed
features in the outlet of the Boost Bar, secure with the latches.
Step 2 — Connect Hoses or lay flat ducting
The adaptor is supplied with 4 x 20ft lengths of 4" Hose and 4 jubilee clips for securing the hose to the adaptor.
Either 4 x 4" Hoses or 4 lengths of 4" diameter lay flat ducting can be fitted to the outlet ports of the adaptor.
4" (100mm) Hoses
When using Hoses slide the end of the hose over each of the 4 ports and fix in place with a jubilee clip or cable tie.
4" (100mm) lay flat ducting
When using lay flat ducting, cut the ducting to the required length and attach one end to the adaptor. The other end can be
taken to a tented drying chamber and be secured in place using adhesive tape.
Alternatively, the lay flat ducting can be tied off at the end of each run and the length of lay flat can be perforated to create
small jets of airflow along the duct. This duct can then be placed up against the base of a wall/cabinet to focus warm dry air
directly onto the affected material or alternatively the duct can be placed in a subfloor space to feed dry air under the floor
space.
Please note that the lay flat ducting should be rated for temperatures greater than 140°F (60°C)