Dynapac BG49 Series Assembly Instructions - Page 4

Browse online or download pdf Assembly Instructions for Industrial Equipment Dynapac BG49 Series. Dynapac BG49 Series 5 pages.

Dynapac BG49 Series Assembly Instructions
- Fasten the cable together using supplied clamps 13 (A clamp each 120 to 130 mm) . Start from the control box
and finish by fastening the cables on the lifting eye .
13
TEST
ALWAYS HAVE THE THROTTLE AT IDLE WHEN STARTING ENGINE
- Test the machine for proper operation .
Check :
- ON/OFF Switch
- Throttle control idle and full speed .
- Blade angle adjustment .
- Dead man handle .
4