Galaxy Aqua 9000 XP Installation Instructions Manual - Page 8

Browse online or download pdf Installation Instructions Manual for Plumbing Product Galaxy Aqua 9000 XP. Galaxy Aqua 9000 XP 11 pages. Pumped instantaneous electric shower

Allow sufficient room between the ceiling
and the shower to access the cover top
screws.
8
SECTION
PRESSURE RELIEF SAFETY
DEVICE
A pressure relief device (PRD) is
designed into the shower unit which
complies with European standards.
The PRD provides a level of appliance
protection should an excessive build up
of pressure occur within the shower.
DO NOT operate the shower with a
damaged or kinked shower hose, or a
blocked sprayhead which can cause the
PRD to operate.
When commissioning, the sprayhead
must be removed from the flexible hose.
Failure to follow this procedure may also
result in causing the PRD to operate.
Ensure the shower is positioned over a
bath or shower tray because if the PRD
operates, then water will eject from the
bottom of the unit.
Should this happen, turn off the
Fig.3
electricity and water supplies to the
shower at the isolating switch and
stopvalve. Contact Customer Service
for advice on replacing the PRD.
The PRD is situated adjacent to the
outlet pipe (Fig.4).
To gain access to it, FIRST SWITCH
OFF THE ELECTRICITY SUPPLY,
remove the cover, then unscrew using
suitable wrench or grips.
CAUTION: Do not attempt to replace
the PRD unless competent to do so.
NOTE: Before replacing the cover, it is
strongly advised to prime the unit (see
'commissioning').
9
SECTION
FITTING THE SHOWER TO
THE WALL
NOTE: The control knobs are an integral
part of the cover – do not attempt to
remove them.
IMPORTANT: The unit must be mounted
on a flat surface which covers the full
width and length of the backplate. It is
important that the wall surface is flat
otherwise difficulty may be encountered
when fitting the cover and subsequent
operation of the unit may be impaired.
'COLD' position and the temperature
control is at 'TEMPERATURE'.
Replace the cover squarely to the
backplate and guide into position so that
the controls locate correctly into the
spindles while at the same time, ensuring
wires are not trapped. Should any
difficulty arise, re-check the points above
Secure the cover in position with the
four retaining screws. DO NOT
OVERTIGHTEN..
Fig.4
PRD
Switch on the mains electric supply to the
shower at the isolating switch.
Press the 'START/STOP' button (Fig.17).
The power indicator will light and the
pump starts to operate.
It will take approximately thirty seconds
for a smooth flow of water to be obtained
whilst air and any debris is being
dispersed from the shower. When a
smooth flow of water is obtained, rotate
the temperature control from '1' to '10'
several times (Fig.18) to release any
Fig.16
trapped air within the unit.
Once flushing out has been completed,
stop the water flow by pressing the
'start/stop' button.
Because the shower is fitted with Phased
(Safety) Shutdown, the indicator light will
begin flash and water flow will be reduced
for approx 8 seconds before the shower
switches off. During this Phased (Safety)
Shutdown, power to the heating elements
is cut. This allows the unit to safely
Fig.17
disipate any residual heat.
Commissioning is complete. Once the
riser rail is fitted, the shower is ready for
13
SECTION
RISER RAIL & SOAP DISH
FITTING INSTRUCTIONS
Fig.12
Fig.18
TIPS
A piece of insulating or masking tape
applied to the wall before marking out the
fixing holes will help stop the drill from
wandering, particularly on tiled surfaces.
When working near a basin or bath, insert
the plug in the waste fitting so that small
parts cannot be lost. Take care not to drop
accessories or tools into basin or bath.