Emerson E2 Quick Start Manual - Page 5

Browse online or download pdf Quick Start Manual for Measuring Instruments Emerson E2. Emerson E2 9 pages. Clarification of the operation of alarm annunciators
Also for Emerson E2: User Manual (17 pages), Quick Reference Manual (2 pages), Quick Setup Manual (2 pages), Quick Start Manual (8 pages), Instruction Manual (12 pages), Quick Start Manual (14 pages), Quick Start Manual (14 pages), Quick Start Manual (9 pages), Installation And Operation Manual (20 pages), Technical Bulletin (8 pages)

Emerson E2 Quick Start Manual
STEP 3: Adding the Device to the E2 Controller
1. Press
,
2. Press
(NEXT TAB) to shift over to the C4: Third Party tab. The name of the device will display in
the list. Highlight the device name, then enter the number of devices and press
changes.
Document Part # 026-4953 Rev 0 07-NOV-2014
©2014 Emerson Climate Technologies Retail Solutions, Inc. This document may be photocopied for personal use.
Visit our website at http://www.emersonclimate.com/ for the latest technical documentation and updates.
(System Configuration),
Figure 6 - Adding the High Pressure CO2
(Network Setup),
(Connected I/O Boards & Controllers).
to save
Page 5 of 9