Galvin Engineering WaterMark 46664 Installation Manuallines - Page 2

Browse online or download pdf Installation Manuallines for Plumbing Product Galvin Engineering WaterMark 46664. Galvin Engineering WaterMark 46664 4 pages. Bs lever action sba

Galvin Engineering WaterMark 46664 Installation Manuallines
Product Installation Guidelines
INSTALLATION
IMPORTANT: Galvin Specialised products must be installed in accordance with these installation instructions and
in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical supply
conditions must also comply to the applicable national and/or state standards. Failing to comply with these
provisions shall void the product warranty and may affect the performance of the product.
Note: Tapware body used as an example only. SBAs can fit on different kinds of Ezy-Wash bodies.
1. Remove Handle
Prior to installation turn off the water supply.
Remove the handle assembly. To prevent
damage, carefully pry off plastic indicator from
the handle. (Use a small flat bladed screwdriver
if necessary).
3. Refit new head
-
Refit new head into tap body.
Note: do not tighten cartridge using the
handle as this will result in damage to the
cartridge
© Galvin Engineering Pty Ltd
2. Replace spindle assembly
New ceramic head
New head
4. Reassemble Handle
-
-
Unscrew the head part from the threaded sleeve
using a 17mm spanner.
Check seat inside tap body for pitting or damage.
Re-seat if necessary
Refit adaptor and reassemble handle by
reversing step 1.
When installation is complete, slowly open
water supply and inspect for leaks.
Document Number: 001.00.70.13
Version 1, 4 November 2022, Page 2 of 4