AGS Parksafe Control Panel Installation & Operation Manual - Page 11
Browse online or download pdf Installation & Operation Manual for Control Panel AGS Parksafe Control Panel. AGS Parksafe Control Panel 16 pages. Ventilation control panel
Also for AGS Parksafe Control Panel: Installation & Operation Manual (16 pages), Installation Operation & Maintenance (16 pages), Installation, Operation & Maintenance Manual (20 pages)
Installation & Operation Manual
OPERATION
First Power Up
Upon connecting mains power, the Parksafe control panel will load for approximately 60 seconds.
During this time the screen will display an 'initialising' screen. The panel will then begin establishing
signals with any Parksafe gas detectors.
Home Screen Status & Condition Overview
System OK.
Under normal/safe conditions.
System in 'Pre-Alarm' condition.
When detected gas reach pre-alarm levels.
OUTPUT 1 relay: activated.
0-10V output: 5V
Other relays and external devices may activate if configured to do so.
System in 'Alarm Delay' condition.
When detected gas reach dangerous alarm levels.
OUTPUT 2 relay: activated.
0-10V Output: 10V
Other relays and external devices may activate if configured to do so.
System in Alarm condition.
When gas levels remain dangerous beyond the alarm delay.
ALARM relay: activated.
Gas detector ID appears on screen.
The internal buzzer will sound to alert the user.
The detector ID of the first signal received will be displayed on screen only.
Temperature Status & Icon
This feature is factory set to off.
If enabled and the temperature levels detected exceed a
selectable threshold, the temperature icon appears and the
system enters an alarm state.
All relays/outputs will activate until the temperature (detected by
Parksafe Detectors) drops below the specified threshold –
adjustable in the configuration settings menu.
AGS Parksafe Panel - IOM Iss: 6 10-20
Parksafe
11