AFL Hyperscale 10011504 Installation Manual - Page 8
Browse online or download pdf Installation Manual for Industrial Equipment AFL Hyperscale 10011504. AFL Hyperscale 10011504 16 pages. Poc level 3 distribution cabinet
Network Cable Preparation and Dressing
Network
Cable
4
Install network cable, minimum 10m overlength (gas block not supplied).
Adjust Network Distribution Cable Tie Point as appropriate
5
Mark off strip point.
8
© AFL Hyperscale. All rights reserved
Gas Block
Use slack loop
for network cable
Strip
Point